The WISE Science Data Center Critical Design Review will be held on January 29-30, 2008. The review location is the 4th floor conference room (KS 410) of the Keith-Spalding building on the campus of the California Institute of Technology. The Keith-Spalding building is located at 1200 E. California Blvd. in Pasadena, CA (the southeast corner of California Blvd. and Wilson Ave.).

Visitor parking is available in the underground parking structure that is accessed off California Blvd., just east of the Keith-Spalding building. Daily parking permits are required for this lot. Visiting review board members will be sent permits in advance of the meeting. Visiting project team members can pick up permits at the review. WISE team members from JPL should get permits from Jennifer Craft before the review.

Information for visitors to IPAC is available on-line at http://www.ipac.caltech.edu/local/Main/visitor.html.

Agenda with Presentation Links

Tuesday January 29, 2008
TimeTitleSpeakers
8:00Meet and Greet
8:30Welcome and IntroductionHelou, Irace, Cutri
8:40Success Criteria, Board Instructions and Scope of ReviewCutri, Green
8:50WISE Science Objective and Mission DesignEisenhardt
9:20WISE Mission Operations SystemRoyer
9:40WSDC Overview, Requirements and ImplementationCutri
10:20Break
10:35WISE Science Data System Design and ArchitectureConrow
12:05Lunch (Executive Session)Board
13:05Ingest SubsystemConrow
13:35Instrumental Frame Calibration (ICAL)Masci
14:05Multiband Source Detection (MDET)Marsh
14:35Break
14:50Position Reconstruction (PREX)McCallon, Fowler
15:35Source Photometry (WPHOT)Jarrett, Marsh
16:20Executive SessionBoard
Wednesday January 30, 2008
8:00Meet and Greet
8:30Frame Coaddition (AWAIC)Masci
9:00Known Solar System Object Association (SSOID)Tholen, Fowler
9:30Photometric Calibration (PCAL)Cutri
9:45System TestingConrow
10:15Break
10:30Data Quality AssuranceKirkpatrick
11:15ArchiveBerriman/Groom
12:00Lunch (Executive Session)Board
13:00Processing System Hardware, ArchitectureBrandenberg
13:30IPAC Computing InfrastructureBurt
13:45Operations PlanConrow
14:15Management, Schedule, ResourcesCutri
15:00Break
15:15Executive SessionBoard
16:15DebriefAll

Supporting Documents

Documents numbered "WSDC D-XXXX" are WSDC-controlled and generated. Documents labelled "JPL D-XXXXX" are controlled by the WISE MOS element and are provided here as background. The JPL documents are not included in the scope of this review.

Click on the document name to retrieve the document in PDF format.

CategoryNumberName
RequirementsWSDC D-R001WSDC Functional Requirements Document (Level 4)
 JPL D-30571Mission Operations System (MOS) Requirements Document (Level 3)
Management/
Plan
WSDC D-M002WISE Project Data Management Plan (PDMP)
 WSDC D-M003WSDC Software Management Plan (SMP)
 WSDC D-M004WSDC Science Data Quality Assurance Plan
 JPL D-33753WISE Calibration Plan
DesignWSDC D-D001WSDS Functional Design Document (FDD)
 WSDC D-D003Position Reconstruction (PRex) Subsystem Design Specification
 WSDC D-D004Multiband Detection (MDET) Subsystem Design Specification
 WSDC D-D005Image Coadder/Mosaicer (AWAIC) Subsystem Design Specification
 WSDC D-D006Source Photometry (WPHOT) Subsystem Design Specification
Interface/
External
JPL D-34372MOS GDS Interface Control Document
 WSDC D-I001WSDC Simulated Data Request
 WSDC D-I005Format Specifications for Pre-Flight Calibration Deliverables
Interface/
Internal 
 Sample Subsystem Interface Specifications (SIS)
 WSDC D-I101ICL01 - FrameProcMask
 WSDC D-I102SFP01 - Lev1Bwcsfits
 WSDC D-I103QUA01 - PSFmoments/QA
User GuidesWSDC D-P003WISEDCOM User Guide


Last Update - 23 January 2008
R. Cutri - IPAC